自動(dòng)涼茬機(jī)是將攤晾、加漿、加曲、攪拌、卸料等工序一次性完成,攤晾效果好,在攤晾過程中設(shè)置多個(gè)攪拌裝置,使涼茬在攤晾過程中松散、不易結(jié)坨,加漿、下曲均勻,數(shù)量可調(diào)節(jié)。那要如何穩(wěn)定的使用自動(dòng)涼茬機(jī)呢?
The automatic stubble cooler is used to complete the processes of spreading, adding slurry, adding starter, mixing, and unloading at one time. The spreading effect is good. Multiple mixing devices are set during the spreading process to make the cool stubble loose and not easy to lump during the spreading process, adding slurry and adding starter are uniform, and the quantity can be adjusted. How to use the automatic stubble cooler stably?
一、安裝前應(yīng)先查看自動(dòng)涼茬機(jī)各部位,零件是否有松動(dòng)現(xiàn)象,如發(fā)現(xiàn),需修理后方可安裝。
1、 Before installation, check all parts of the automatic stubble cooler for looseness. If found, it can be installed only after repair.
二、安裝時(shí),打茬機(jī)跑車輪與道軌間隙以打茬機(jī)與軌跡來回跑動(dòng)時(shí)為規(guī)范。
2、 During installation, the clearance between the running wheel of the stubble machine and the track shall be the standard when the stubble machine runs back and forth with the track.
三、打茬機(jī)安裝結(jié)束后,需要行試工作五分鐘左右,查看各部位是否有雜音現(xiàn)象出現(xiàn),如發(fā)現(xiàn)雜音應(yīng)泊車檢修,待試工作正常后,方可投入正常生產(chǎn)運(yùn)用。
3、 After the installation of the stubble machine, it is necessary to carry out a trial operation for about five minutes to check whether there is any noise in each part. If any noise is found, it should be parked for maintenance. After the trial operation is normal, it can be put into normal production and operation.
四、運(yùn)用過程中,應(yīng)經(jīng)常留意有無異常動(dòng)靜,轟動(dòng)是否加大,如發(fā)現(xiàn)雜音應(yīng)及時(shí)泊車檢修。
4、 During operation, pay attention to whether there is any abnormal movement and noise, and whether the noise is increased. If any noise is found, park the car for maintenance in time.
五、打茬機(jī)投入運(yùn)用后,應(yīng)定期查看螺栓有無松動(dòng),零部件有無損壞,如發(fā)現(xiàn)應(yīng)根據(jù)具體情況檢修或更換零部件。
5、 After the stubble machine is put into use, check regularly whether the bolts are loose and whether the parts are damaged. If found, repair or replace the parts according to the specific situation.
六、在運(yùn)用過程中,注油部位應(yīng)定期注油,一般每三個(gè)月注黃油一次,以確保打茬機(jī)各傳動(dòng)部位潤(rùn)滑正常,減少磨損。
6、 In the process of application, the oil injection part shall be filled with oil regularly, generally once every three months, to ensure the normal lubrication of all transmission parts of the stubble machine and reduce wear.
七、自動(dòng)涼茬機(jī)若長(zhǎng)時(shí)間停用從頭投入生產(chǎn)運(yùn)用時(shí),要從頭進(jìn)行查看,并通過試車工作正常后再投入生產(chǎn)運(yùn)用。
7、 If the automatic stubble cooler is stopped for a long time and put into production again, it should be checked from the beginning and put into production again after the test run is normal.
如何穩(wěn)定的使用自動(dòng)涼茬機(jī)?這個(gè)問題就從7個(gè)方面講解完畢,您對(duì)此有什么疑惑或者需求,歡迎您來我們網(wǎng)站
http://www.lmkxbs.cn咨詢了解!
How to use the automatic stubble cooler stably? This question has been explained in seven aspects. If you have any doubts or needs, please come to our website http://www.lmkxbs.cn Consult and understand!