一、安裝設(shè)備
1、 Installation equipment
山東釀酒設(shè)備廠家:先將熱處理爐、料桶和閉式冷卻塔放置好,接著將管路、過氣閥門接好,再用生石灰粉標(biāo)出熱處理爐、料桶和閉式冷卻塔的部位后將他們游戲多開,安裝時(shí)先裝熱處理爐、再依據(jù)熱處理爐部位微調(diào)料桶的放置,接著安裝制冷設(shè)備。
Shandong brewing equipment manufacturer: first place the heat treatment furnace, material barrel and closed cooling tower, then connect the pipeline and gas passing valve, and then mark the parts of the heat treatment furnace, material barrel and closed cooling tower with quicklime powder, and then open them more. During installation, install the heat treatment furnace first, fine tune the placement of material barrel according to the parts of the heat treatment furnace, and then install the refrigeration equipment.
二、設(shè)備清洗
2、 Equipment cleaning
山東釀酒設(shè)備廠家:小型釀酒設(shè)備的清理工作中是十分關(guān)鍵的,假如無(wú)法恰當(dāng)?shù)倪M(jìn)行便會(huì)造成釀制的酒異味重,環(huán)境衛(wèi)生不合格等狀況。在安裝前需要用涼水對(duì)設(shè)備進(jìn)行各個(gè)方面的工作中,確保釀酒過程的基本上性能。設(shè)備投入工作中前,要用蒸汽進(jìn)行,具體方法是:將熱處理爐、料桶和閉式冷卻塔連接好,打火,造成蒸汽后三十分鐘后關(guān)閉電源總開關(guān),進(jìn)行工作中交付使用。
Shandong brewing equipment manufacturer: the cleaning of small brewing equipment is very key. If it cannot be carried out properly, it will cause heavy peculiar smell of brewed wine and unqualified environmental sanitation. Before installation, the equipment needs to be removed in all aspects with cold water to ensure the basic safety performance of the brewing process. Before the equipment is put into operation, it shall be removed with steam. The specific method is to connect the heat treatment furnace, material barrel and closed cooling tower, ignite, turn off the main power switch 30 minutes after the steam is caused, and deliver it for use in operation.
三、設(shè)備維護(hù)管理與維護(hù)保養(yǎng)
3、 Equipment maintenance management and maintenance
1.小型釀酒設(shè)在產(chǎn)酒時(shí)應(yīng)該應(yīng)用軟化水處理進(jìn)行那樣可以降低水中的污漬對(duì)設(shè)備造成危害。
1. Softened water shall be used for small-scale brewing during wine production, so as to reduce the damage of stains in the water to the equipment.
2.每次工作中進(jìn)行后,應(yīng)打開放進(jìn)水閥排空熱處理爐內(nèi)部的儲(chǔ)水,降低污漬沉積的狀況。
2. After each work, open the water drain valve to drain the water stored in the heat treatment furnace to reduce the deposition of stains.