①?zèng)]有設(shè)備壓力表或設(shè)備:一些實(shí)用程序喜歡校準(zhǔn)測(cè)試儀,這些設(shè)施一般很好地為他們的現(xiàn)場(chǎng)人員提供銜接檢測(cè)設(shè)備,可是有些設(shè)備甚設(shè)備配件的接口。盡管沒(méi)有規(guī)則,可是這樣規(guī)劃以便能夠看到設(shè)備的實(shí)際壓力。即使有監(jiān)督操控和數(shù)據(jù)采集和遙測(cè)能力,有人在某一點(diǎn)將站在設(shè)備旁邊,需求看看壓力是什么,那是那么便利
① No equipment pressure gauge or equipment: some utilities like to calibrate the tester. These facilities generally provide a good interface for their field personnel to connect with the testing equipment, but some equipment and even equipment accessories can be connected. Although there are no rules, it is planned so that you can see the actual pressure on the equipment. Even with the ability of supervisory control and data acquisition and telemetry, someone will be standing next to the equipment at a certain point and need to see what the pressure is. That's so convenient
②設(shè)備空間太小:假如很麻煩設(shè)備一個(gè)設(shè)備站,或許觸及挖掘混凝土等工作,不要企圖經(jīng)過(guò)使它盡或許削減設(shè)備空間,節(jié)省那點(diǎn)本錢。在后期進(jìn)行根本的維護(hù)將是非常困難的。還要記住一點(diǎn):東西或許會(huì)很長(zhǎng),因而需求設(shè)置空間預(yù)留空間,以便可以松開(kāi)螺栓。
② Equipment space is too small: if it is very troublesome to equip an equipment station, or touch the excavation of concrete and other work, do not try to make it as far as possible to reduce the equipment space, save the cost. It will be very difficult to carry out fundamental maintenance at a later stage. One more thing to remember: things may be very long, so you need to set up space for the bolts to loosen.
③不考慮后期拆卸:大多數(shù)時(shí)分,設(shè)備人員明白,你不能在一個(gè)混凝土室中將一切東西銜接在一起,而不需求某種類型的銜接,以便在將來(lái)的某個(gè)時(shí)刻去除部件。假如一切的部件都緊緊地?cái)Q緊,沒(méi)有間隙,將它們分開(kāi)幾乎是不或許的。無(wú)論是槽型聯(lián)軸器,法蘭接頭仍是管接頭,都是必要的。在將來(lái),有時(shí)或許需求移除部件,而且盡管這一般不是設(shè)備承包商的擔(dān)心,可是它應(yīng)該是一切者和工程師的重視。
③ Don't think about late dismantling: most of the time, equipment personnel understand that you can't connect everything together in a concrete chamber without requiring some kind of connection to remove the parts at some point in the future. If all the parts are tightly tightened and there is no gap, it is almost impossible to separate them. Whether it is groove type coupling, flange joint or pipe joint is necessary. In the future, it may sometimes be necessary to remove parts, and although this is not generally the concern of equipment contractors, it should be the concern of all parties and engineers.
④同心異徑管水平設(shè)備:這或許是吹毛求疵,可是也值得重視。偏疼異徑管可以水平設(shè)備。同心異徑管是設(shè)備在垂直線。在一些使用中需求設(shè)備在水平線,要使用偏疼減速器,但這個(gè)問(wèn)題一般觸及到本錢:同心異徑管廉價(jià)。
④ Concentric reducers horizontal equipment: this may be nitpicking, but it's worth noting. Migraine reducers can be horizontal devices. Concentric reducers are equipment in the vertical line. In some applications, the equipment is required to be in the horizontal line, and the migraine reducer should be used, but this problem generally involves the cost: the concentric reducer is cheap.
此外,當(dāng)釀酒設(shè)備的壓力下降時(shí),空氣從懸浮液中排出而且被轉(zhuǎn)移到管道中,這將導(dǎo)致設(shè)備下流出現(xiàn)問(wèn)題。 一個(gè)簡(jiǎn)單的放氣設(shè)備將脫節(jié)或許存在的任何空氣,并將防止下流的問(wèn)題。 操控設(shè)備上游的放氣設(shè)備也是有用的,由于引導(dǎo)管線中的空氣或許導(dǎo)致不穩(wěn)定性。
In addition, when the pressure of the brewing equipment drops, the air is discharged from the suspension and transferred to the pipeline, which will cause problems of equipment downflow. A simple venting device will disconnect any air that may be present and will prevent downflow problems. It is also useful to operate the venting equipment upstream of the equipment, as air in the pilot line may cause instability.